Rectangular backyard pool beside a lake with a pergola, deck water jets and swim-up stools
Planning & Schedule Guide

Pool Construction Timeline: From Design to First Swim

Understanding the order of construction makes it much easier to plan around a target swim season. While the exact calendar depends on your design, property conditions, approvals and weather, every custom gunite pool moves through the same core stages.

The build phases in order

  1. 1

    1. Consultation & site evaluation

    We walk your property to review elevation, access, utilities, drainage and how you plan to use the space.

  2. 2

    2. 3D design & material selection

    We create 3D renderings and work with you on pool shape, features, tile, coping, decking and equipment.

  3. 3

    3. Permits & HOA review

    Municipal permits, zoning setbacks and neighborhood HOA architectural approvals are completed before excavation begins.

  4. 4

    4. Excavation & layout

    The pool outline is marked and excavated. Subsurface rock or tight site access can add days at this stage.

  5. 5

    5. Steel rebar & rough plumbing/electrical

    Our crew ties the steel reinforcement cage and runs main drains, returns, skimmers, lighting niches and equipment trenches.

  6. 6

    6. Pneumatic gunite & curing

    The concrete shell is sprayed, hand-shaped and cured to build structural strength.

  7. 7

    7. Tile, coping, masonry & decking

    Waterline tile, stone coping, water features, patios and any outdoor living structures are built.

  8. 8

    8. Interior finish, fill & orientation

    The interior aggregate or plaster finish is applied, the pool is filled and balanced, and we walk you through the controls.

What most commonly affects the schedule

  • HOA and municipal permit review windows, which vary across Nashville, Franklin, Brentwood and county jurisdictions.
  • Heavy rain, saturated clay soil or winter freezing temperatures during excavation, gunite or finishing.
  • Mid-project design or material changes after construction has started.
  • Added scope such as a pool house, outdoor kitchen, retaining walls or custom masonry.
  • Crew coordination—builders relying on multiple external subcontractors often face gaps between trades, whereas an in-house crew keeps sequencing under one roof.

When to start planning in Middle Tennessee

If your goal is to be swimming by late spring or early summer, starting design and permitting in the fall or winter gives you the best cushion for HOA review, material lead times and spring weather. Waiting until April to begin design usually pushes completion into late summer or fall.

Frequently Asked Questions

Can pool construction continue through winter in Nashville?
Many stages—such as design, permitting, excavation, steel and rough plumbing—can move forward during mild Tennessee winter periods, while temperature-sensitive steps like gunite and interior finishing are scheduled around weather windows.
How does using an in-house crew affect timing?
Because Pools By Elio does not wait on outside subcontractor schedules for excavation, steel, plumbing, gunite and finishing, sequencing stays directly under Jonathan Elio Rodriguez's control.
When will I receive a schedule for my project?
We outline the expected build sequence and timeline in your written proposal once the design and site conditions are reviewed.

Planning ahead for next swim season?

Book an on-site consultation now so design and approvals are ready well ahead of your target date.

Pool Construction Timeline